Contacts

Address:

No. 2 Qunying Road, Fushan District, Yantai, Shandong Province, China

 

E-mail:

dipajcd@gmail.com

wl18865573253@gmail.com

 

Wechat / whatsapp / Skype:

+86 18254591008 (Grace)

+86 18865573253 (Howdy)

 

Telegram

+86 18254591008

Excavator DX205 20.5 Tons
+
  • Excavator DX205 20.5 Tons

Excavator DX205 20.5 Tons

When the client presses the 'active regeneration' button, the green light on the dashboard and the appearance of a pop-up window are normal, please do not turn off the engine.
  • Product description
  •                      Technical Parameter

                                Model                                          DX205     

    Outline Dimension

    Transport height (to top of boom)

    O

    (mm)

    3,102

    Transport height (to top of hose)

    P

    (mm)

    3,263

    Transport length

    Q

    (mm)

    9,487

    Transport width

    R

    (mm)

    2,988

    Counterweight clearance ground

    S

    (mm)

    1,060

    Height (to the top of the cab)

    T

    (mm)

    2,970

    Width of the turning table

    U

    (mm)

    2,709

    Cab height (above turntable)

    V

    (mm)

    1,910

    Full width of cab

    W

    (mm)

    1,010

    Center distance between guide wheel and drive wheel

    X

    (mm)

    3,270

    Track length

    Y

    (mm)

    4,063

    Total width

    Z

    (mm)

    2,988

    Track width

    a

    (mm)

    600

    Track height

    b

    (mm)

    924

    Minimum ground clearance

    c

    (mm)

    450

    Scope of Work

    Maximum digging distance

    A

    (mm)

    9,792

    Maximum digging distance on the ground

    B

    (mm)

    9,619

    Maximum digging depth

    C

    (mm)

    6,518

    Maximum loading height

    D

    (mm)

    6,821

    Minimum loading height

    E

    (mm)

    2,404

    Maximum digging height

    F

    (mm)

    9,601

    Maximum height of bucket pin

    G

    (mm)

    8,252

    Maximum vertical arm digging depth

    H

    (mm)

    3,774

    Maximum vertical radius

    I

    (mm)

    8,008

    Maximum digging depth of 8 feet on flat ground

    J

    (mm)

    6,329

    Minimum digging radius for 8 feet of flat ground

    K

    (mm)

    2,771

    Minimum digging distance

    L

    (mm)

    755

    Minimum swing radius

    M

    (mm)

    3,545

    Bucket extension Angle

    d

    (° )

    177

                         Main Specification

    Engine

    Model

    Perkins 1204EA

    Inhale

    Turbocharging

    Number of cylinders

    4

    Cylinder diameter

    105mm

    Piston stroke

    127 mm

    Power 

    110kw/2,200 rpm

    Cylinder

    Boom

    115×80×1,263mm

    Arm

    135×95×1,443mm

    Bucket

    110×75×1,060mm

    Drive Unit and Brakes

    Steering control

    Integrated control of foot pedal and control lever

    Drive mode

    Hydraulic drive

    Travel motor

    Axial plunger hydraulic motor

    Traveling speed (high/low)

    6.0/3.6km/hr

    Operate the brakes

    Hydraulic braking

    Working Weight (Operator, Lubricant, Coolant, Full Fuel Tank and Standard Configuration)

    Bucket

    0.92m3

    Working weight

    19,850kg

    Boom

    5,600 mm HD

    Arm

    2,900 mm HD

    Hydraulic System

    Type

    VBO(EFI)

    Maximum flow

    192.4L/min

    Turning System

    Drive mode

    Hydraulic drive

    Reducing mechanism

    Planetary gear reduction

    Turn the operation brake

    Wet multi-disc brakes

    Swing speed

    11.2rpm

    Safety Valve Set Value

    Hydraulic circuit of working device

    350/370 kg/ cm²

    Travel the hydraulic circuit

    350 kg/ cm²

    Rotary hydraulic circuit

    290 kg/ cm²

    Fuel Tank Capacity

    Fuel tank

    355L

    Hydraulic oil tank

    195L

    Coolant/Lubricant Capacity (Replacement)

    Radiator

    30L

    Engine

    29L

    Traveling gearbox gear oil

    2×3.3L

    Reversible reducer

    5L

    Maximum Digging Force (ISO)

    Bucket

    13.2ton

    Bucket(When powered)

    13.9ton

    Arm

    10.1ton

    Arm(When powered)

    10.7ton

     

    New VB0 system with electronic control

    Thanks to the advanced main pump with electronic control, hydraulic power is precisely regulated to ensure flow on demand.

    SPC3 system

    The comprehensively upgraded SPC3 system regulates engine speed and torque at the main pump output in real-time depending on the intensity of working conditions.

    Platinum engines

    Meet 20T requirements

    Adoption of EGR+DPF exhaust gas cleaning program

    Meet low-temperature

    starting capability and high altitude (5000 m)

    High operational performance

    Bucket volume of 0.92 cubic meters

    High hydraulic efficiency

    High-efficiency electronic hydraulic system VB0 is used

    Electronically controlled hydraulic system

    SPC3 (intelligent power control)

    Multifunctional operating mode P+/P/S/E

    High quality and convenience

    Standard load (HD) arm size

    8-inch touch device

    Comfortable and safe driving conditions

    LED display
    a. Short trip odometer: amount of fuel used, operating time, average fuel consumption, average daily fuel consumption.
    b. Confirmation of warning messages: equipment warning message
    c. Oil filtration system information: usage time of main maintenance resources, replacement intervals, rest time.

    Centralized button design
    a. Central switch
    b. USB 12V charging
    c. Intuitive air conditioning control panel

    Spacious storage space on the back of the seat
    Dustproof and soundproof cabin
    LED working lights

    Engine information

    1. Active regeneration

    When the customer presses the 'active regeneration' button, the green light on the dashboard and the appearance of a pop-up window are normal, please do not turn off the engine. Do not turn off the engine immediately after regeneration is complete.

    2. Manual regeneration

    When the red light appears, 'manual regeneration' must be performed, do not turn off the engine.

    3. Use original products: please use CJ-4 motor oil and qualified fuel.

    4. Prohibition

    Low-quality diesel fuel and motor oil are prohibited.

    Convenient, fast, and economical maintenance

    Centralized access to cabin service cartridges - simplicity of repair.

    Reliable and convenient maintenance system

    National Iy exhaust gas cleaning system
    The four-cylinder Perkins 1204EA engine with powerful performance characteristics fully meets the requirements of Stage IV emission standards.
    The unique after-treatment system eliminates the need for urea and saves time and effort on regular maintenance.

    1. High-efficiency cooling system
    2. Battery disconnect switch
    3. Centralized lubrication line
    4. Upper anti-slip plate
    5. Wear-resistant bushings

     

Production capacity

The company has a modern production workshop and advanced manufacturing equipment, which provides a reliable guarantee of product quality and production efficiency. We manage production in strict accordance with the ISO9001 quality management system to ensure that each link meets quality standards. At the same time, we also have advanced testing equipment and strict quality control processes to ensure product standardization.

Research and development capabilities:

The company has established a good reputation in the field of scientific research, has a high-quality and professional R&D team, and holds a number of invention patents. Team members possess rich industry experience and professional knowledge and are committed to technological innovation and modernization of excavators and cylindrical equipment.

Keyword:

Excavator DX205 20.5 Tons

FAQ

Question

The content of the excavator is as follows


Answer

Question 1: The warranty period of the excavator

Answer: One year or 2,000 hours

Question 2: Can replacement parts be found in the customer's country?

Answer: Yes. (We provide some small accessories for free.)

Question 3: Can customized services be provided?

Answer: Yes. (We can offer color customization and logo customization.)

Question 4: What kind of engine is adopted?

Answer: Chinese engines or imported engines (as per customer requirements)

Engines are classified into single-cylinder engines, two-cylinder engines and three-cylinder engines

Question 5: What are the modes of transportation?

Answer: Ocean transportation, railway transportation and road transportation

For ocean transportation, we are not responsible for customs clearance and tariffs. We only handle delivering the goods to ports (such as the Port of St. Petersburg and the Port of Vladivostok).

For railway and road transportation, we are responsible for customs clearance and tariffs. If the customer needs it, it can be delivered directly to the door

Question

The contents of the hydraulic cylinder are as follows


Answer

Question 6: The materials that need to be provided by the customer before making a quotation

Answer: Hydraulic cylinder number/parameter photo/Hydraulic cylinder floor plan (It is best to provide two sets of materials)

3D design drawings of hydraulic cylinders can be made (only design drawings are required, but an additional charge applies. If you place an order for purchase, it can be free of charge).

Question 7:  Can customized services be provided?

Answer: Yes. (We can offer color customization and logo customization.)

Question 8:

Payment Method:30% advance payment +70% payment before shipment

Question 9: Transaction process

We offer quotations. The customer pays a 30% advance payment and the factory arranges for production. After the factory production is completed, we will provide a video for the customer to confirm the status of the goods. Once confirmed to be correct, the customer will pay 70% of the balance. After the factory receives the payment for goods, we will deliver the goods.

Question 10: Payment Account

Company payment: If payment is made through a company account, we can provide a company account (VTB account).

If it is an individual payment, we can provide a personal account (only accepting rubles).

The time for the funds to arrive: generally, it is 1 to 3 days

< 1 > 跳转到

Consultation

Products of any complexity at the best price!

Leave a Request

Get in touch with us!


I need more details. date of delivery payment method transfer canal
Submit