Product
Contacts
Address:
No. 2 Qunying Road, Fushan District, Yantai, Shandong Province, China
E-mail:
Wechat / whatsapp / Skype:
+86 18254591008 (Grace)
+86 18865573253 (Howdy)
Telegram

Excavator DX205 20.5 Tons
- Product description
-
Technical Parameter
Model DX205
Outline Dimension
Transport height (to top of boom)
O
(mm)
3,102
Transport height (to top of hose)
P
(mm)
3,263
Transport length
Q
(mm)
9,487
Transport width
R
(mm)
2,988
Counterweight clearance ground
S
(mm)
1,060
Height (to the top of the cab)
T
(mm)
2,970
Width of the turning table
U
(mm)
2,709
Cab height (above turntable)
V
(mm)
1,910
Full width of cab
W
(mm)
1,010
Center distance between guide wheel and drive wheel
X
(mm)
3,270
Track length
Y
(mm)
4,063
Total width
Z
(mm)
2,988
Track width
a
(mm)
600
Track height
b
(mm)
924
Minimum ground clearance
c
(mm)
450
Scope of Work
Maximum digging distance
A
(mm)
9,792
Maximum digging distance on the ground
B
(mm)
9,619
Maximum digging depth
C
(mm)
6,518
Maximum loading height
D
(mm)
6,821
Minimum loading height
E
(mm)
2,404
Maximum digging height
F
(mm)
9,601
Maximum height of bucket pin
G
(mm)
8,252
Maximum vertical arm digging depth
H
(mm)
3,774
Maximum vertical radius
I
(mm)
8,008
Maximum digging depth of 8 feet on flat ground
J
(mm)
6,329
Minimum digging radius for 8 feet of flat ground
K
(mm)
2,771
Minimum digging distance
L
(mm)
755
Minimum swing radius
M
(mm)
3,545
Bucket extension Angle
d
(° )
177
Main Specification
Engine
Model
Perkins 1204EA
Inhale
Turbocharging
Number of cylinders
4
Cylinder diameter
105mm
Piston stroke
127 mm
Power
110kw/2,200 rpm
Cylinder
Boom
115×80×1,263mm
Arm
135×95×1,443mm
Bucket
110×75×1,060mm
Drive Unit and Brakes
Steering control
Integrated control of foot pedal and control lever
Drive mode
Hydraulic drive
Travel motor
Axial plunger hydraulic motor
Traveling speed (high/low)
6.0/3.6km/hr
Operate the brakes
Hydraulic braking
Working Weight (Operator, Lubricant, Coolant, Full Fuel Tank and Standard Configuration)
Bucket
0.92m3
Working weight
19,850kg
Boom
5,600 mm HD
Arm
2,900 mm HD
Hydraulic System
Type
VBO(EFI)
Maximum flow
2×192.4L/min
Turning System
Drive mode
Hydraulic drive
Reducing mechanism
Planetary gear reduction
Turn the operation brake
Wet multi-disc brakes
Swing speed
11.2rpm
Safety Valve Set Value
Hydraulic circuit of working device
350/370 kg/ cm²
Travel the hydraulic circuit
350 kg/ cm²
Rotary hydraulic circuit
290 kg/ cm²
Fuel Tank Capacity
Fuel tank
355L
Hydraulic oil tank
195L
Coolant/Lubricant Capacity (Replacement)
Radiator
30L
Engine
29L
Traveling gearbox gear oil
2×3.3L
Reversible reducer
5L
Maximum Digging Force (ISO)
Bucket
13.2ton
Bucket(When powered)
13.9ton
Arm
10.1ton
Arm(When powered)
10.7ton
New VB0 system with electronic control
Thanks to the advanced main pump with electronic control, hydraulic power is precisely regulated to ensure flow on demand.
SPC3 system
The comprehensively upgraded SPC3 system regulates engine speed and torque at the main pump output in real-time depending on the intensity of working conditions.
Platinum engines
Meet 20T requirements
Adoption of EGR+DPF exhaust gas cleaning program
Meet low-temperature
starting capability and high altitude (5000 m)
High operational performance
Bucket volume of 0.92 cubic meters
High hydraulic efficiency
High-efficiency electronic hydraulic system VB0 is used
Electronically controlled hydraulic system
SPC3 (intelligent power control)
Multifunctional operating mode P+/P/S/E
High quality and convenience
Standard load (HD) arm size
8-inch touch device
Comfortable and safe driving conditions
LED display
a. Short trip odometer: amount of fuel used, operating time, average fuel consumption, average daily fuel consumption.
b. Confirmation of warning messages: equipment warning message
c. Oil filtration system information: usage time of main maintenance resources, replacement intervals, rest time.Centralized button design
a. Central switch
b. USB 12V charging
c. Intuitive air conditioning control panelSpacious storage space on the back of the seat
Dustproof and soundproof cabin
LED working lightsEngine information
1. Active regeneration
When the customer presses the 'active regeneration' button, the green light on the dashboard and the appearance of a pop-up window are normal, please do not turn off the engine. Do not turn off the engine immediately after regeneration is complete.
2. Manual regeneration
When the red light appears, 'manual regeneration' must be performed, do not turn off the engine.
3. Use original products: please use CJ-4 motor oil and qualified fuel.
4. Prohibition
Low-quality diesel fuel and motor oil are prohibited.
Convenient, fast, and economical maintenance
Centralized access to cabin service cartridges - simplicity of repair.
Reliable and convenient maintenance system
National Iy exhaust gas cleaning system
The four-cylinder Perkins 1204EA engine with powerful performance characteristics fully meets the requirements of Stage IV emission standards.
The unique after-treatment system eliminates the need for urea and saves time and effort on regular maintenance.1. High-efficiency cooling system
2. Battery disconnect switch
3. Centralized lubrication line
4. Upper anti-slip plate
5. Wear-resistant bushings
Production capacity
The company has a modern production workshop and advanced manufacturing equipment, which provides a reliable guarantee of product quality and production efficiency. We manage production in strict accordance with the ISO9001 quality management system to ensure that each link meets quality standards. At the same time, we also have advanced testing equipment and strict quality control processes to ensure product standardization.

Research and development capabilities:
The company has established a good reputation in the field of scientific research, has a high-quality and professional R&D team, and holds a number of invention patents. Team members possess rich industry experience and professional knowledge and are committed to technological innovation and modernization of excavators and cylindrical equipment.

Keyword:
Excavator DX205 20.5 Tons
FAQ

The content of the excavator is as follows

Question 1: The warranty period of the excavator
Answer: One year or 2,000 hours
Question 2: Can replacement parts be found in the customer's country?
Answer: Yes. (We provide some small accessories for free.)
Question 3: Can customized services be provided?
Answer: Yes. (We can offer color customization and logo customization.)
Question 4: What kind of engine is adopted?
Answer: Chinese engines or imported engines (as per customer requirements)
Engines are classified into single-cylinder engines, two-cylinder engines and three-cylinder engines
Question 5: What are the modes of transportation?
Answer: Ocean transportation, railway transportation and road transportation
For ocean transportation, we are not responsible for customs clearance and tariffs. We only handle delivering the goods to ports (such as the Port of St. Petersburg and the Port of Vladivostok).
For railway and road transportation, we are responsible for customs clearance and tariffs. If the customer needs it, it can be delivered directly to the door

The contents of the hydraulic cylinder are as follows

Question 6: The materials that need to be provided by the customer before making a quotation
Answer: Hydraulic cylinder number/parameter photo/Hydraulic cylinder floor plan (It is best to provide two sets of materials)
3D design drawings of hydraulic cylinders can be made (only design drawings are required, but an additional charge applies. If you place an order for purchase, it can be free of charge).
Question 7: Can customized services be provided?
Answer: Yes. (We can offer color customization and logo customization.)
Question 8:
Payment Method:
Question 9: Transaction process
We offer quotations. The customer pays a 30% advance payment and the factory arranges for production. After the factory production is completed, we will provide a video for the customer to confirm the status of the goods. Once confirmed to be correct, the customer will pay 70% of the balance. After the factory receives the payment for goods, we will deliver the goods.
Question 10: Payment Account
Company payment: If payment is made through a company account, we can provide a company account (VTB account).
If it is an individual payment, we can provide a personal account (only accepting rubles).
The time for the funds to arrive: generally, it is 1 to 3 days
Consultation